Skip to content

AC EV Charging Stations and Charging Pedestals for Outdoor Sites

Built for sites where a car stays parked for hours rather than minutes. JIYA manufactures AC charging points at 3.5 kW and 7 kW for campsites, hotel car parks, staff parking and mixed-use outdoor space, sized by how long the vehicle actually stays rather than by how quickly it can be topped up.

  • AC Charging at 3.5 kW and 7 kW
  • RFID Access Control and kWh Metering
  • IP55 Wall-Mounted, IP54 Combined Pedestal
  • Power, Water and Charging in One Column
Urban & Public Spaces - Robust Utility Infrastructure for Urban and Public Spaces
Direct Factory Manufacturer

Direct Factory Manufacturer

Competitive Factory Pricing

Competitive Factory Pricing

stable Lead Times

stable Lead Times

OEM/ODM Customization Support

OEM/ODM Customization Support

  • Standard connectors: Type 1 (SAE J1772) or Type 2 (IEC 62196), matched to the market the site serves
  • Protection at the charging circuit, so a fault at one bay does not take out the whole row
Urban & Public Spaces - Public Safety & Liability Mitigation

What a Charging Point Actually Needs

01 / PARKING DURATION
How long the vehicle actually stays?

Overnight and long-stay parking suits 3.5 kW. Daytime turnover parking suits 7 kW. Charging speed follows the stay, not the price tag.

02 / CONNECTOR
What the vehicle accepts?

Type 1 (SAE J1772) for North America and Japan, Type 2 (IEC 62196) for Europe and most other markets. The connector is fixed at order.

03 / ACCESS
Who is allowed to charge?

RFID card access where charging is staff-only, resident-only or paid. Open access where the point is genuinely public.

04 / METERING
Who pays for the energy?

A kWh meter where the site resells electricity or charges by usage, so each session can be verified rather than estimated.

05 / ENVIRONMENT
What the weather does to it over 10 years?

IP55 housing on the wall-mounted models, IP54 on the combined pedestal. Impact rating and housing material differ by model, so check the specification for the unit you are ordering.

06 / MOUNTING
Whether it goes on a wall or on its own base?

Wall mounting where there is a suitable wall and the cable run is short. Pedestal mounting where the point sits in a car park or a pitch. The GREC140 combined pedestal carries two sockets, two taps and one 7 kW charger in one column.

Charging Model Chart

Model Power Supply Connector Mounting Housing Suited to
GREC 3.5KW-A 3.5 kW 16 A single phase Type 1 or Type 2 Wall or pedestal IP55 Overnight and long-stay parking
GREC 7KW-SC 7 kW 32 A single phase Type 1 or Type 2 Wall or pedestal IP55 Daytime turnover parking
GREC1403623S 7 kW 32 A single phase Type 1 or Type 2 Floor mounted IP54, 304 stainless Full-serviced pitches with power, water and charging

Charging Time Chart

Battery capacity 3.5 kW 7 kW Typical vehicle
40 kWh 12 to 13 h 6 to 7 h Compact electric car
60 kWh 18 to 19 h 9 to 10 h Mid-size electric car
75 kWh 23 to 24 h 11 to 12 h Large electric car
100 kWh 30 to 32 h 15 to 16 h Large SUV or van

How We Match a Charger to Your Site

1
Confirm the Parking Stay

How long a car is normally parked, and how many bays need a point.

2
Fix the Connector

Type 1 or Type 2, according to the market the site serves.

3
Set Access and Metering

Whether charging is open, card-controlled or billed by the kWh.

4
Select the Model

3.5 kW, 7 kW, or the GREC140 combined pedestal, against the model table above.

5
Confirm Commercial Details

Available supply at the site, lead time, and the electrical documentation the installer needs.

Solutions for Your Channel or Project

OWNERS & OPERATORS

Site Owners and Operators

Charging points for campsites, hotels, offices and mixed-use car parks, sized by the parking stay.

CONTRACTORS & INSTALLERS

Electrical Contractors and Installers

Circuit requirements, mounting details and cable routing for the installation.

DISTRIBUTORS & RESELLERS

Distributors and Resellers

Standard models held for resale, with packaging and labelling to your brand.

OEM & ODM

Brands

OEM and ODM work from connector and colour through to a new housing.

Tell Us Your Channel

Discuss specifications, site build schedules, or OEM/ODM customization with our engineering team.

01

GREC 3.5KW-A

Overnight and long-stay parking

3.5 kW · 16 A single phase · Type 1 or Type 2 · IP55

02

GREC 7KW-SC

Daytime turnover parking

7 kW · 32 A single phase · Type 1 or Type 2 · IP55

03

GREC1403623S

Power, water and charging in one column

7 kW · 32 A single phase · Floor mounted · IP54, 304 stainless

Urban & Public Spaces - Our Technical Integrity

Our Technical Integrity

  • Charging speed follows the parking stay: 3.5 kW for overnight and long-stay parking, 7 kW for daytime turnover parking. The charger is selected by how long a vehicle actually stands, not by the highest number on a datasheet.
  • Connector fixed to the destination market: Type 1 (SAE J1772) for North America and Japan, Type 2 (IEC 62196) for Europe and most other markets. The connector is confirmed at order and does not change afterwards.
  • Housing rating stated per model: IP55 on the wall-mounted units, IP54 on the GREC140 combined pedestal. Impact rating and housing material differ by model, so the specification is stated for the unit being ordered rather than for the range.
  • Access and metering built in: RFID card access where charging is staff-only, resident-only or paid. A kWh meter where the site resells electricity or bills by usage, so every session can be verified rather than estimated.

FAQ

No. The range is alternating current only, at 3.5 kW and 7 kW. These are chargers for sites where a vehicle stands for hours, such as campsites, hotel car parks and staff parking. If a site needs DC fast charging, this range is not the right product and we will say so.

A 40 kWh battery takes about 12 to 13 hours at 3.5 kW and about 6 to 7 hours at 7 kW. A 100 kWh battery takes about 30 to 32 hours and 15 to 16 hours respectively. These assume a near-empty battery and about 90 percent charging efficiency. Actual time depends on the vehicle’s onboard charger, remaining charge, battery temperature and ambient conditions.

No. The connector is set at order because it determines the cable assembly and the housing entry. Type 1 (SAE J1772) and Type 2 (IEC 62196) are not interchangeable on the same unit.

Yes. RFID card access restricts use to card holders, which suits staff parking, resident parking and paid charging. Points that should be open to the public can be supplied without card control.

Yes where a kWh meter is fitted. The meter records consumption per session so the site can charge by usage rather than by estimate. Whether billing is possible also depends on the local resale rules, which the site owner confirms.

It depends on the supply already at the site and how many bays are fitted. Each 7 kW unit draws 32 A single phase and each 3.5 kW unit draws 16 A single phase, so the number of bays is checked against available capacity before the model is confirmed. We ask for the site capacity at the enquiry stage rather than after the order.

Request a Quote

Fill out the form below and our specialists will respond within 24 hours on business days.